Shipping TMR Mixers by Container: Export Packing Guide

Plan ocean freight for vertical TMR equipment: crating, tilt and height limits, customs documents, and site checks before first mix.

Choosing container type and load plan

Vertical TMR tubs often travel partially disassembled: auger, driveline guards, and discharge extensions may ship in separate crates to keep height inside a 40 ft high-cube limit near 2.69 m door opening clearance. A 5 m³ complete wagon may fit one high-cube with wheels removed; 9 m³ units frequently split across tub plus axle crate. Request a loading diagram from the supplier before booking freight so your forwarder does not roll to open-top or breakbulk prematurely. Mark center of gravity on the skid; port cranes and inland rigs both punish offset weight.

Crating, corrosion control, and moisture

Marine crating should use heat-treated lumber with vapor barrier on machined surfaces such as PTO stubs and gearbox flanges. Bag desiccant in the auger box and tape inspection covers closed so salt air does not reach seals during a three-to-five-week lane. Photograph serial plates and bolt torque marks at factory gate; customs and insurance both ask for them if damage is claimed at destination. If you ship with tires mounted, deflate slightly and protect sidewalls from strap bite with wide webbing—not chain direct on rubber.

Customs, HS codes, and import paperwork

Agricultural machinery imports typically need commercial invoice, packing list, bill of lading, and certificate of origin aligned with the buyer’s tariff schedule. Ask the exporter to list main tub, auger assembly, and optional scale as separate line items with harmonized codes your broker confirms—misclassification delays clearance more than ocean transit. Some countries require fumigation stamps on wood crating or prohibit certain timber species; verify before crating is sealed. Reserve duty and VAT cash flow in your landed cost model so commissioning parts such as hydraulic oil and PTO shaft are not held at port for payment timing.

Receiving, assembly, and first batch checklist

Unload on level ground and support the tub on blocking before removing slings; premature wheel install can twist the frame. Torque PTO guards and driveline to supplier values, fill gearbox with the specified grade, and spin the auger dry before adding feed. On first batch, run at moderate Auger Speed with a light load to seat seals and verify discharge door alignment along a test fence. Document any crate damage within 48 hours for carrier notice. Keep the packing list with part crate cross-reference taped inside the electrical panel for the local technician who may not read the original language of the manual.

Factory crating for 3 to 9 m³ vertical tanks includes tie-down points matched to 20 ft and 40 ft high-cube loading diagrams.